Return to Projects

FedEx Freight Birmingham

Industrial & Manufacturing

Client:

FedEx Freight

Project Type:

Industrial, Distribution Facility

Size:

58,000 SF

Location:

Birmingham, AL

FedEx Freight Distribution Terminal | Birmingham, Alabama

Overview

MGB Development Group delivered a 58,000-square-foot build-to-suit distribution terminal for FedEx Freight in Birmingham, Alabama. The facility is built to support FedEx Freight’s high-volume less-than-truckload (LTL) operations while strengthening connectivity across its southeastern network.

Key Features

  • Cross-dock terminal design for high-volume LTL operations
  • Optimized dock layout and trailer capacity
  • Efficient truck circulation
  • Direct access to I-20
  • Controlled-access site with perimeter security
  • On-site fueling and maintenance facilities
  • Office and administrative areas
  • Site expansion opportunity

MGB’s Role

MGB Development Group served as owner and developer, providing project financing and managing development from site acquisition to delivery in partnership with FedEx Freight. The team oversaw design, permitting, and construction, ensuring the facility met FedEx Freight’s operational requirements and terminal standards. The completed facility supports FedEx Freight’s ability to efficiently serve southeastern markets while handling high-volume freight movement.